The building will be of modern steel portal frame construction with concrete slab flooring and insulated metal cladding to the roof and block-work walls above a height of two metres. The Springside estate has an established storage and light industrial use. Each of the new units will benefit from the following features:
● Ground and mezzanine floors
● Full height roller shutter doors & loading bays
● 3 phase electricity supply
● Mains water & draiange
● P30 access – 24/7
● Designated external car parking